When assessing a risk for the first
time you should assume there are no controls already in place. The subsequent two assessments are
completed with
1) those controls already in place and 2) with any additional controls needed to reduce the risk further. The assessor should assign values for the identified ‘likelihood’ of occurrence (A) and the severity of the ‘Impact’ (B). By multiplying ‘A’ and ‘B’ together you get the rating score, which gives an indication of how important the risk is. The thick black line is the “line of tolerance”. Those risks that are plotted above the line (score 10 – 25) are “out of tolerance” and should be referred to CRMG for further consideration. |
LIKELIHOOD (A)
|
Very Likely
5
|
5
|
10
|
15
|
20
|
25
|
Likely
4
|
4 |
8
|
12
|
16
|
20
|
|
Feasible
3
|
3
|
6
|
9
|
12
|
15
|
|
Slight
2
|
2
|
4
|
6
|
8
|
10
|
|
Very unlikely
1
|
1
|
2
|
3
|
4
|
5
|
|
Insignificant
1
|
Minor
2
|
Significant
3
|
Major
4
|
Critical
5
|
||
IMPACT (B) |
Green = Low risk, Amber 9 = Medium risk, Amber 10 –12 high
risk, Red = High risk
Likelihood of Occurrence (A)
|
Severity of Impact (B)
|
1- Very unlikely (hasn’t occurred before)
|
1 - Insignificant (have no effect)
|
2 - Slight (rarely occurs)
|
2 - Minor (little effect)
|
3 - Feasible (possible, but not common)
|
3 - Significant (may pose a problem)
|
4 - Likely (has before, will again)
|
4 - Major (Will pose a problem)
|
5 - Very Likely (occurs frequently)
|
5 - Critical (Immediate action required)
|
Version: Status:
Author:
Date:
Exercise on risk assessment
Part 1—What are the risks associated with working
in a flower farm/construction site/soap making factory
Part 2—Evaluate the likelihood and potential impact of the
risks:
Risks
|
Probability?
(High, Medium, Low)
|
Potential Impact? (High,
Medium, Low)
|
Overall Significance of
Risk
(High, Medium, Low)
|
1)
|
|||
2)
|
|||
3)
|
|||
4)
|
|||
5)
|
Which risks should you focus your resources on?
Comments